A project review meeting has been scheduled for a 1 West Orange Avenue in South San Francisco. The project proposal includes the construction of a new aquatic center at Orange Memorial Park. An existing aquatic center is slated for demolition under the same permit.
ELS Architecture & Design LLC is responsible for the designs. BFK Engineers is the civil engineer on the project. SWA is responsible for the landscape design.
The aquatics center will be constructed within the existing Orange Memorial Park at the corner of Tennis Drive and Orange Avenue. The scope of the project includes a new building with indoor pool, outdoor swimming pool, and sitework. The outdoor pool will span an area of 6,226 square feet and the indoor pool will span an area of 5,430 square feet. Amenities include eight showers for both male and female, along with five lavatories for male and female.
The building will not serve as an emergency operation center. A project review meeting has been scheduled for tomorrow, November 2, 2023 at 7 PM, details of joining can be found here.
Subscribe to YIMBY’s daily e-mail
Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews
Be the first to comment on "Meeting Scheduled For Orange Memorial Park Aquatic Center, South San Francisco"