New Office Campus Coming To 2560-70 Orchard Parkway In North San Jose

Takara Bio USA office complex enclosed courtyard between office buildings at 2560 and 2570 Orchard Parkway in north San Jose, concept. Rendering by DG ArchitectsTakara Bio USA office complex enclosed courtyard between office buildings at 2560 and 2570 Orchard Parkway in north San Jose, concept. Rendering by DG Architects

Takara Bio USA has released renderings showing off their new vision for the two office buildings at 2560-70 Orchard Parkway in North San Jose. The Bio company hopes to develop a campus environment with enclosed courtyards taking over existing surface parking. Each building will have 64,500 square feet of space, making 129,000 square feet of space in total. Tamara paid $44.8 million in May for the properties. The company is a silicon-based component of a Japanese. Currently, they occupy 57,000 square feet of office space at 1290 Terra Bella Avenue in Mountain View.

Two office and research buildings at 2560 and 2570 Orchard Parkway in north San Jose that are owned by Takara Bio USA, outlined in red and shown with Takara logo.

Two office and research buildings at 2560 and 2570 Orchard Parkway in north San Jose that are owned by Takara Bio USA, outlined in red and shown with Takara logo.

The office buildings’ site is on the outer fringes of the massive North San Jose office complex. Currently, the future campus is surrounded by large fields, a space that is supposed to be new office structures in the future. The buildings that they will soon occupy will have minor changes to their façades, as they will remove “the postmodern stucco elements [of the structure] and replace them with a simpler canopy design,” according to what the company submitted to San Jose planners.

The site sits at the intersection of Orchard Parkway and Component Drive. Via a short walk on Component Drive, light rail is accessible through the Component Station, offering easy access to downtown San Jose, where many residents live, and Caltrain can make connections.

DG Architects have drafted the design for the proposal. An estimated completion date was not announced.

Subscribe to YIMBY’s daily e-mail

Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews

.

Be the first to comment on "New Office Campus Coming To 2560-70 Orchard Parkway In North San Jose"

Leave a comment

Your email address will not be published.


*