Development permits have been filed for a residential infill at 1667 14th Street in the Prescott neighborhood of West Oakland, Alameda County. The proposal seeks to add six dwelling units to a vacant parcel near Raimondi Park and Mandela Parkway. The property owner is listed as an Alameda-based individual.

1667 14th Street site plan, illustration by Fumio Suda Architect

1667 14th Street view of the central driveway, rendering by Fumio Suda Architect
The complex will yield around 9,010 square feet across five structures. There will be six residential apartments, including four primary three-bedroom units and two one-bedroom accessory dwelling units in an attached backyard duplex. Berkeley-based Fumio Suda Architect is responsible for the design, and Greyhawk Construction Inc. is the project consultant.
The property is located along 14th Street between Campbell Street and Willow Street. The parcel borders Willow Park, three blocks from Mandela Parkway, and four blocks from Raimondi Park. The site currently has a single-story commercial structure, formerly a garden supply store.

1667 14th Street, image via Google Street View
The estimated construction cost and timeline have not yet been shared.
Subscribe to YIMBY’s daily e-mail
![]()
Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews






these units appear to have been designed in a basement in China. The windows have no relationship with the floor plans, the yards in front have no relation to the elevation-perspective…..seems so careless.
Parking nightmare.
God I hate paying for car insurance.
There’s no reason to not build the ADU portion out to the property line setbacks. They’ve lost at least 200 sq ft on each ADU (on the sides). The design of the ADU in relation to the other units doesn’t make any sense, there are windows 10′ apart from another person’s bedroom. They could have made the ADU bedroom windows not face those.
The ADU part could have started on the 2nd floor