Preliminary Application For Housing at 2820 South El Camino Real, San Mateo

2820 South El Camino Real establishing view, rendering by Costa Brown Architecture2820 South El Camino Real establishing view, rendering by Costa Brown Architecture

Preliminary permits have been filed for an eight-story apartment complex at 2820 South El Camino Real in San Mateo, San Mateo County. The proposal looks to build an office-looking apartment complex on a vacant property across from the Hillsdale Caltrain Station and near the Hillsdale Mall. Millbrae-based LF George Properties Corp. is responsible for the application as the property owner.

2820 South El Camino Real view of the retail parking spaces, rendering by Costa Brown Architecture

2820 South El Camino Real view of the retail parking spaces, rendering by Costa Brown Architecture

2820 South El Camino Real lobby, rendering by Costa Brown Architecture

2820 South El Camino Real lobby, rendering by Costa Brown Architecture

The roughly 100-foot-tall structure is expected to yield around 176,800 square feet, including 75 apartments and a 75-car garage. Unit sizes will vary with 20 one-bedrooms, 48 two-bedrooms, and seven three-bedrooms. Ten units will be deed-restricted as affordable to low-income households. The ground floor will include two retail spots and an entrance along 28th Avenue to the two-story residential basement garage. The second floor will include residential amenities, including a business center, social lounge, and fitness center.

Costa Brown Architecture is responsible for the design. The L-shaped apartment complex will rise around an existing gas station at the corner of El Camino Real and 28th Avenue. The facade does appear more like an office building, wrapped with curtain-wall glass and balcony carve-outs. Plans include a small open-air court at the center of the structure, carving a hole from the roof down to a small gathering space by the lobby and shops.

2820 South El Camino Real corner view overlooking the ECR, rendering by Costa Brown Architecture

2820 South El Camino Real corner view overlooking the ECR, rendering by Costa Brown Architecture

2820 South El Camino Real, image via Google Satellite

2820 South El Camino Real, image via Google Satellite

The roughly half-acre property is just half a block from the Hillsdale Caltrain Station, and a few blocks north of the Hillsdale Mall. Future residents will be a 15-minute walk or five minute bicycle ride from the nearest grocery store.

The application invokes Senate Bill 330 to streamline the approval process. The cost and timeline for construction have not yet been shared.

Subscribe to YIMBY’s daily e-mail

Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews

.

2 Comments on "Preliminary Application For Housing at 2820 South El Camino Real, San Mateo"

  1. A project a day being proposed in San Mateo

    • no rhyme or reason, no design standards, no cohesion, no nothing. Building on steroids, gonna be traffic and congestion on steroids.

Leave a comment

Your email address will not be published.


*