Preliminary Plans For 2455 El Camino Real, Palo Alto

2455 El Camino Real, rendering by OTJ Architects2455 El Camino Real, rendering by OTJ Architects

Preliminary plans have been filed for a six-story apartment complex at 2455 El Camino Real in Palo Alto, Santa Clara County. The project will replace an existing hotel with 76 apartments on a corner lot near the California Avenue commercial thoroughfare and Caltrain Station. San Francisco-based Bayhill Ventures is the project sponsor.

2455 El Camino Real facade elevations, illustration by OTJ Architects

2455 El Camino Real facade elevations, illustration by OTJ Architects

The roughly 65-foot-tall structure is expected to yield around 132,500 square feet, including 86,150 square feet of housing and 27,900 square feet for the two-level basement garage. Parking will be provided for 152 cars and 80 bicycles. Unit types will vary with five studios, 48 one-bedrooms, and 23 two-bedrooms. The development invokes a 100% density bonus with the inclusion of six very low-income units and six moderate-income units.

OTJ Architects is responsible for the fairly uninspired design. Illustrations published alongside the pre-application show a boxy structure wrapped in brick veneer and painted stucco. The San Francisco-based firm has a more compelling portfolio than this project suggests, leaving hope that the conceptual design might change.

2455 El Camino Real, image via Google Satellite

2455 El Camino Real, image via Google Satellite

The 0.4-acre property is on a block bound by El Camino Real, Sherman Avenue, California Avenue, and Ash Street. Future residents will be on the southern end of the retail-rich California Avenue thoroughfare, and only a few blocks from the neighborhood’s train station. At the northern end of the commercial strip is a Mollie Stones grocery store, which REDCO Development filed plans to replace with a 17-story mixed-use project in 2023.

The estimated cost and timeline for construction have not yet been shared.

Subscribe to YIMBY’s daily e-mail

Make YIMBY preferred on Google

Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews

.

Be the first to comment on "Preliminary Plans For 2455 El Camino Real, Palo Alto"

Leave a comment

Your email address will not be published.


*