Downtown Oakland

2016 Telegraph Avenue, image by Andrew Campbell Nelson

Facade Installation Underway for 24-Story Mixed-Use Tower at 2016 Telegraph Avenue In Uptown, Oakland

An 24-story mixed-use tower has topped out and is nearly halfway wrapped with its new facade at 2016 Telegraph Avenue in Uptown, Oakland. The building’s towering facade reaches over 180 feet above the ground, and adds 230 new apartments to the fast-changing neighborhood. The 200,000 square foot mixed-use building will include a ground floor residential lobby accompanied by retail space, and three levels of above grade parking.

Read More



1431 Jefferson Street under construction, iPhone image from SFYIMBY tipster

Construction Halfway to Peak for Marriott at 1431 Jefferson Street, Downtown Oakland

A new Marriott-owned hotel is quickly rising at 1431 Jefferson Street, just two blocks from Frank H. Ogawa Plaza in Downtown Oakland. The concrete structure has reached the half-way point in its march to the 18th floor. Once complete, it’ll open up 276 hotel rooms, of which roughly half will be managed by a Marriott Residence Inn and the other half by the Marriott-owned AC Hotel. Hawkins Way Capital is responsible for the development after fully purchasing the property in 2019 for $30 million.

Read More


Fetching more...