Site Visit

2016 Telegraph Avenue, image by Andrew Campbell Nelson

Facade Installation Underway for 24-Story Mixed-Use Tower at 2016 Telegraph Avenue In Uptown, Oakland

An 24-story mixed-use tower has topped out and is nearly halfway wrapped with its new facade at 2016 Telegraph Avenue in Uptown, Oakland. The building’s towering facade reaches over 180 feet above the ground, and adds 230 new apartments to the fast-changing neighborhood. The 200,000 square foot mixed-use building will include a ground floor residential lobby accompanied by retail space, and three levels of above grade parking.

Read More


Element Hotel by Marriott, 1130 Champions Drive, rendering from Nexus

Construction Topped Out for Element Hotel by Marriott, 1130 Champions Drive, Newhall, San Jose

Construction has topped out for the U-shaped five-story Element Hotel by Marriott, confirmed by a recent site visit to the property at 1130 Champions Drive in Newhall, San Jose. The new building will span 115,000 square feet, producing 175 guest rooms immediately opposite the San Jose Earthquakes soccer stadium and the city’s international airport. The project, led by Nexus Development, is part of a much larger mixed-use plan, the Coleman Highline.

Read More

345 4th Street at night, rendering by Stanton Architecture

Facade Installation Underway for 345 4th Street, SoMa, San Francisco

Facade installation is nearly complete for a new seven-story mixed-use office building at 345 4th Street in SoMa, San Francisco. A recent site-visit by SFYIMBY shows that the curtain wall installation has reached the sixth floor, is fully installed along 4th Street, and nearly finishing along Tandang Sora Street. Stanton Architecture is responsible for the design and is listed as the property owners operating through 4th & Harrison SF, LLC.

Read More


Fetching more...