3701 E Commerce Way 3D View

New Apartment Complex At 3701 E Commerce Way, Sacramento

Construction permits have been submitted for a new residential development on 3701 E Commerce Way, Sacramento. This is a part of a larger project at 3701 and 3811 E Commerce Way and will be executed in two phases. The entire project includes seven four-story residential buildings and 360 parking spaces, including covered, uncovered, and individual garage spaces. AG Spanos Companies is the developer, and Kephart is the architect managing the project.

Read More

280 Woz Way, rendering by C2K Architecture

Project Review: Renderings for 280 Woz Way, Downtown San Jose

Today’s headline story is a project review of one of the more substantial urban developments in the Bay Area. KT Urban plans to build a 1.8 million square foot office building at 280 Woz Way in downtown San Jose, the heart of Silicon Valley. The project will bring two 297-foot conjoined towers, replacing a handful of single-family houses and extending the city’s burgeoning skyline further south.

Read More

2400 Adeline Street Conceptual Elevations

Permits Filed For New Multi-Family Housing At 2400 Adeline Street, Oakland

Development permits have been filed for construction at 2400 Adeline Street in McClymonds, Oakland. The project proposal includes demolishing an existing commercial building and constructing a five-story residential building with twenty-nine condominiums. The new development will also have a parking garage with fifteen spaces on the ground floor and a rear detached one-story garage with fourteen parking spaces. KTGY Architects, Signature Development Group and Ripley Designs are managing the concept and design of this project.

Read More


30 Otis Street, image by Andrew Campbell Nelson

30 Otis Street Tops Out, Facade Nearly Complete in SoMa, San Francisco

Construction is moving quickly on the 26-story tower at 30 Otis Street in SoMa, San Francisco. Since SFYIMBY’s update in late September, the concrete structure has topped out, and the curtain wall glass facade is just a handful of stories from the peak. Once complete, the project will produce 418 new residential units in the ‘The Hub,’ a rezoned district as part of the city’s master plan. Align Development is responsible for the design.

Read More